•      An Innovative, Dependable Subsea Contractor, With Experience in Depth     •

Contract Duration: 3 Weeks Client: Higgins Group plc  The Canal and River Trust required remedial work carrying out to the canal wall to include application of Sika 610 to steel piles, below water concrete repairs and the design/ fabrication and installation of re-cycled plastic fenders at in-pans.

Read More →

Contract Duration: 7 Days Client: Aquatic Control Engineering  We were asked by Aquatic Control Engineering on behalf of the Environment Agency to install eel pass systems to structures located around Norfolk. This project was carried out during the winter to minimise disruption to the public

Read More →

Contract Duration: 5 Days Client: Babcock international.  Babcock International asked us to reconstruct a collapsed section of quay used for diver training. The project involved stabilizing the existing quayside, underpinning and re-concreting the whole area. The team also re-graded the shingle surface and removed all debris from the work-site. The project was once again completed […]

Read More →

Contract Duration: 4 months  Client:  Volker Stevin  We were contracted by Volker Stevin to carry out the immersion phase of the 4 concrete elements structures that together made the new Tyne tunnel, Newcastle. The operations took place during the winter of 2009/2010. the Dive team conducted the operations 24/7 in snow,ice and temperatures of -12. […]

Read More →

Contract Duration: 2 Months  Client: Cambridge County Council We carried out detailed inspections on 22 bridge structures around Cambridge, Peterborough and Bedford. The detailed inspection surveys included a full dimensional, conditional and scour evaluation. 5 of the structures required remedial works and our services were procured to carry out repairs. These ranged from re-pointing, re-grouting, […]

Read More →

​Contract Duration: 7 days Client: Bridgeway Consultants  We carried out a detailed inspections on the bridge structures and surrounding steel Piles. the detailed inspection surveys included a full dimensional, conditional and steel thickness survey using the latest Cygnes underwater thickness meters. the purpose of the survey was to assess the steel structures suitability for the installation […]

Read More →