Diving Inspection and Fishpass Installation
Contract Duration: 7 Days
Client: Aquatic Control Engineering
We were asked by Aquatic Control Engineering on behalf of the Environment Agency to install eel pass systems to structures located around Norfolk. This project was carried out during the winter to minimise disruption to the public