Bow River Village – Phase 2
Contract Duration: 3 Weeks
Client: Higgins Group plc
The Canal and River Trust required remedial work carrying out to the canal wall to include application of Sika 610 to steel piles, below water concrete repairs and the design/ fabrication and installation of re-cycled plastic fenders at in-pans.