•      An Innovative, Dependable Subsea Contractor, With Experience in Depth     •

Contract Duration: 7 days

Client: Bridgeway Consultants 

We carried out a detailed inspections on the bridge structures and surrounding steel Piles. the detailed inspection surveys included a full dimensional, conditional and steel thickness survey using the latest Cygnes underwater thickness meters. the purpose of the survey was to assess the steel structures suitability for the installation of a new foot bridge located next to the main structure.

The works were based on a fixed price basis and works were completes on budget and ahead of schedule.