Contract Duration: 2 Months 

Client: Cambridge County Council

We carried out detailed inspections on 22 bridge structures around Cambridge, Peterborough and Bedford. The detailed inspection surveys included a full dimensional, conditional and scour evaluation. 5 of the structures required remedial works and our services were procured to carry out repairs. These ranged from re-pointing, re-grouting, underpinning, block and brick replacement and score remediation around cut-waters.

All works were based on a fixed price basis and work were complete on budget and ahead of schedule.